The capacity of the cement silos at the two works is 24,000 tons. A modern power station at Rhoose, with two 3,250 kW. generators, supplies power to both works, that required at Aberthaw being conveyed by means of a 33,000-volt transmission line. A transformer at the receiving point reduces this voltage to 3,300.